- 1. Disproportionate withdrawal penalty on the buyer
- 2. Unilateral spec change clause
- 3. Buyer charged with municipal capital gains tax
- 4. Liability waiver for defects
- 5. Non-essential deadline clause
- 6. Imposed notary or agent chosen by developer
- 7. Prior acceptance of project changes
- 8. Forum clause outside the consumer's domicile
- 9. Anticipated waiver of LOE rights
- 10. Asymmetric default penalty clause
- How to attack: the imprescriptible nullity action
- FAQ
1. Disproportionate withdrawal penalty on the buyer
'If the buyer withdraws, they shall forfeit 30% of amounts paid plus an additional €10,000 penalty.' Typically unfair under RDLeg 1/2007 art. 85 (significant imbalance to the consumer's detriment). Successfully challenged when the clause is not reciprocal or the amount is disproportionate to the developer's actual loss.
2. Unilateral spec change clause
'The developer may replace materials specified in the spec document with similar or equivalent ones without prior notice.' Unfair. The spec document is binding. The Supreme Court has rejected 'equivalence' as a general authorisation to lower quality.
3. Buyer charged with municipal capital gains tax
'Capital gains tax shall be borne by the buyer.' Unfair. Spanish Local Treasury Law assigns the seller as taxable person (developer in new build). Any clause inverting the burden is void.
4. Liability waiver for defects
'The developer is released from any construction defect except those expressly claimed before delivery.' Void by operation of law. The LOE is mandatory law and admits no prior waiver.
5. Non-essential deadline clause
'The delivery date is purely indicative and not an essential term.' Used to dilute breach. Unfair. Case law requires any tolerance clause to be concrete (3-6 months), not generic.
6. Imposed notary or agent chosen by developer
'The deed shall be granted before the notary appointed by the developer and the costs shall be borne by the buyer.' Free choice of notary is a consumer right (Notarial Regulation). The clause restricting it is unfair. Extra imposed costs too.
7. Prior acceptance of project changes
'The buyer accepts any project modification approved by the council during construction.' Generic and therefore unfair. Substantial changes trigger termination; blank acceptance violates basic rights.
8. Forum clause outside the consumer's domicile
'Any dispute shall be submitted to the Courts of [city far from the buyer].' In B2C relations express submission outside the consumer's domicile is unfair (consolidated CJEU case law).
9. Anticipated waiver of LOE rights
'The buyer waives any action arising from the LOE.' Radically void. The LOE is mandatory public-order law.
10. Asymmetric default penalty clause
'If the buyer is late on payments, they shall pay 1% daily on the amount due. If the developer is late on delivery, statutory interest applies.' Manifest asymmetry. Unfair. The penalty on the buyer is disproportionate compared with statutory interest on the developer.
How to attack: the imprescriptible nullity action
The unfair-clause nullity action (RDLeg 1/2007 art. 83) is imprescriptible per CJEU case law (among others CJEU C-698/18). You can request it at any time: before signing, during execution, after the deed. If declared void, the clause is treated as not written and amounts paid under it are refunded with statutory interest from payment date.
Frequently asked questions
If I signed years ago, can I still claim?
Yes. The action is imprescriptible. The initial contract review tells you which clauses are challengeable and what amounts you could recover.
How much can I recover attacking unfair clauses?
Variable. If you paid taxes (municipal capital gains) that did not correspond to you, you recover them in full with interest. If you signed with an unfair penalty, the clause is voided at no cost to you.
Source: RDLeg 1/2007 arts. 80-91. CJEU C-698/18 and consolidated Spanish Supreme Court case law.